A mid-construction or completion loan refinances a project that is partly built and finishes it. Builders and investors use construction completion loans, broken-construction loans and stalled-project financing when the original construction lender will not extend or fund further draws, when a self-funded build has run out of cash, or when they buy an unfinished project from a distressed seller.

Also known as: Mid-Const

Overview: What Makes This Loan Unique

  • The lender inherits someone else’s project. A completion lender steps in partway through, with work it did not inspect and a budget it did not approve. Every program asks the same questions: why did it stop, what has been spent, what remains, and is the structure weather-tight.
  • Two values, two tests. The loan is sized against the as-is value of the partially built property and the as-completed value (after-repair value, ARV). Most programs advance 50–70% of as-is at closing and fund 100% of the remaining budget through draws, capped at 70–80% of completed value and 75–90% of total cost (loan-to-cost, LTC).
  • Fund control replaces trust. Completion lenders run in-house fund control: a fresh budget-to-complete, itemized spending to date with lien releases, draw inspections and a built-in interest reserve.
  • Not every lender wants these. Many bridge and fix-and-flip lenders decline mid-construction bailouts outright; a smaller set market completion as a product. Pricing tracks private construction lending, with the cost of a stalled project showing up as lower leverage, bigger reserves and stricter sponsor tests. Also called construction takeout, construction rescue or construction-to-completion bridge.

Who This Loan Is For

  • Builders whose construction lender has stopped funding or refused an extension.
  • Owners who self-funded a build and need to recover capital or finish the last phase.
  • Investors buying a stalled project from a distressed seller, bank or receiver.
  • When another loan fits better: a project that has not started belongs under Ground-Up Construction; a finished building awaiting lease-up under Bridge Loans; a cosmetic renovation under Fix & Flip; a defaulted loan with no construction left under Bail-Out / Rescue.

Eligible Collateral and Property Requirements

  • Single-family spec and custom homes, townhomes, condos, 2-4 unit and small multifamily (2–20 units), infill rebuilds and subdivision phases; commercial completion on a smaller number of bridge programs.
  • Non-owner-occupied, business-purpose only.
  • Permits current, plans approved, no stop-work orders or unresolved violations.
  • The structure should be weather-proofed or close to it.
  • Work in place documented with invoices and lien releases; clean title or a plan to clear mechanic’s liens at closing.
  • Entitled land with utilities at the lot; remaining site work is excluded by many vertical lenders.
  • Major metros preferred; several programs are limited to one state or region; conversions fall outside most completion programs.

Funding Limits and Leverage

Completion loans are sized on three tests at once (as-is value, completed value and total cost), and the lowest result controls. For income property, the debt service coverage ratio (DSCR, net operating income divided by annual debt service) at stabilization is tested as well.

At a glance · Funding Limits and Leverage
Measure Low End Typical Range High End / Exception
Loan amount $100,000–$300,000 $500,000–$10 million $15–$100 million on institutional programs
Initial advance on as-is value 50% (no fund control cash-out) 65–70% 75–80%
Loan-to-cost (LTC) 65–70% 75–85% 90% under about $2 million with experience; 100% of remaining construction cost
Loan-to-completed value (ARV) 65% 70–75% 80%
Remaining budget financed 80% 100% 100% plus up to 20% of budget as cash-out
DSCR floor (income property completion) — 1.20x at stabilization
  • Several programs allow 85% LTC under $2 million but cap loans of $3–10 million at 75% LTC.
  • Completed comparable projects earn the top of the range; inexperienced sponsors see 65–70% LTC.
  • Cash-out with no fund control is capped near 50% of as-is value; full draw control unlocks the higher tiers.

Pricing and Terms

At a glance · Pricing and Terms
Term Typical Range Notes
Interest rate 9–13% fixed interest-only; Prime + 2–2.5% or SOFR-based on commercial bridge Interest on drawn funds only on some programs; closed-deal examples cluster at 10.5–12.5%
Origination points 1–3% 1.5–2.5 points typical
Other fees Appraisal (as-is and as-completed), fund control and inspection fees per draw, legal, lien title endorsements; 1% extension fee per 6 months
Loan term 12–18 months standard; 6–24 months range One or two 6-month extensions for a fee
Amortization / payments Interest-only; balloon at maturity Interest reserve funded at closing
Prepayment None or 3–6 months minimum interest
Recourse Full recourse with personal and completion guaranty Non-recourse only on large institutional bridge
Reserves / holdbacks Interest reserve, construction holdback released by draw, 5–10% contingency Retainage of 5–10% per draw on some programs

Actual pricing and terms vary by program, property, borrower strength and market conditions. The ranges above describe where most programs fall; exception-based programs can go beyond these limits in either direction.

Qualification Requirements

  • Credit: 650–680 FICO on most construction-based programs; 600 on hard-money completion; no minimum on a few asset-based programs at 50–65% of as-is value.
  • Experience: 3+ completed transactions or several comparable projects in the last 12–24 months; no-experience programs exist at lower leverage.
  • Liquidity and reserves: verified, unrestricted liquidity to cover overruns and carry (often 10% of remaining budget plus the interest reserve).
  • Net worth: net worth equal to the loan amount on institutional programs.
  • Entity and guaranty: LLC or corporation borrower with personal and completion guaranties; no construction default in the last 5 years on stricter programs.
  • Income documentation: none on asset-based programs; two months of bank statements, personal financial statement and schedule of real estate owned on most.

What Underwriting Analyzes and the Documents You Will Need

What is analyzed: - Why the project stalled and whether the cause is resolved. - Budget to complete verified against plans and a site inspection; spending to date matched to work in place. - As-is and as-completed value from an appraisal (or exterior valuation and comps on small programs). - Exit feasibility: sale at completed value or refinance at a supportable DSCR. - Contractor capacity, lien exposure and title; sponsor track record and project load.

Documents: - Plans, permits and inspection card; any stop-work notices and resolutions. - Line-item budget to complete with contractor bids; itemized spending to date with invoices and lien releases. - Existing loan payoff or purchase contract. - Contractor résumé and license; sponsor bios with completed-project history; entity documents, financial statement, schedule of real estate owned, bank statements; title, builder’s risk insurance and exit plan.

Process and Timeline to Fund

  1. Submit the project summary, budget to complete, spending to date and photos; lenders screen the reason for the stall and respond within 1–3 business days.
  2. Term sheet and deposit; appraisal or valuation and a site inspection are ordered, and title is checked for mechanic’s liens.
  3. Underwriting reconciles budget, plans and permits and sets the draw schedule, interest reserve and contingency.
  4. Loan documents and closing; existing liens are paid off or subordinated and permits confirmed current.
  5. Construction resumes; draws fund against inspections, often within 24–48 hours, until completion and exit.

Closings range from about 7–14 days on regional no-appraisal programs to 2–4 weeks on most construction-based programs and 30–45 days when lien issues or permit renewals must be resolved; timing varies by program, valuation and title.

Challenges of Funding and Common Deal-Killers

  • A stall story that does not hold up: years unfinished, an overextended borrower, or an unresolved dispute with the prior lender or contractor.
  • Mechanic’s liens, stop-work orders, expired permits, or unpermitted work that must be opened up and inspected.
  • Spending to date that cannot be documented or does not match the work in place.
  • A budget to complete that, added to existing debt, exceeds 75–80% of completed value.
  • Remaining horizontal or site work that vertical lenders will not fund.
  • Sponsors with thin liquidity, no comparable completions, or a construction default.
  • Exit risk: stale comps, a soft for-sale market, or a rental takeout that will not cover.

Program Variations and Sub-Niches

  • Dedicated completion loans ($100,000–$10 million): 75–90% LTC and 70–75% of finished value, 12–24 months, permits required, in-house draws, no presale requirement; for builds that ran long, lender withdrawals, and buying another builder’s unfinished project.
  • Mid-construction inside ground-up programs ($200,000–$10 million): 80–90% LTC, 65–70% of completed value, 680+ FICO, builder experience required, interest on drawn funds; accepted with a clear budget to complete and spending to date.
  • Fix-and-flip structure on a partially built project ($300,000+): 65% of as-is value at closing plus up to 20% of budget as cash-out plus 100% of remaining budget; 85% LTC under $2 million, 75% for $3–10 million; a no-fund-control variant caps at 50% of as-is value.
  • Regional no-appraisal mid-construction bridge: 65–70% loan-to-value (LTV) on as-is value, interest-only, no minimum FICO, funding in 7–14 days; limited to one state or region.
  • Luxury spec home completion ($3–15 million): 75% of completed value with fund-controlled budget and built-in interest reserve, experienced builders in prime markets.
  • Commercial bridge completion ($1–100 million): 65–75% LTC, Prime or SOFR-based pricing, recourse below about $20 million.
  • Build-to-rent completion with DSCR takeout: rolls into a 30-year rental loan with seasoning waived at occupancy.