Niche Loans Complex loans we place every day

Construction

Apply Now

We have many programs and not all terms are available in all programs. Contact us to find out the best options for your situation.

A ground-up construction loan funds the building of a new structure on a vacant or cleared lot, from the land acquisition or site work through the final certificate of occupancy. Builders, developers and real estate investors use construction loans for spec homes, townhome and small-subdivision projects, build-to-rent communities, apartment buildings and commercial buildings, drawing funds in stages as the work is completed rather than receiving the full amount at closing.

Also known as: Construction, Ground Up Construction, New Construction

Overview: What Makes This Loan Unique

  • The collateral does not exist yet. At closing the lender holds a lien on a lot and a set of plans. Value is created in stages, so the loan is advanced in stages: an initial advance against the land, then a series of draws reimbursing completed work after an inspection. The lender’s exposure grows only as the building does.
  • Three measures govern the loan, not one. Lenders size a construction loan to loan-to-cost (LTC, the loan as a share of land plus hard and soft costs), to a cap on the finished value (after-repair value or as-completed value, often written ARV or LTARV), and to an initial advance against the as-is land value. The lowest of the three controls proceeds.
  • Cash flow is zero until the exit. Nothing is leased or sold while the building goes up, so interest is paid out of pocket or from an interest reserve built into the loan. Many programs charge interest only on funds actually drawn (non-Dutch interest) rather than on the full commitment.
  • Execution risk sits with the operator. A half-finished building is worth less than the lot it sits on. Lenders therefore underwrite the builder’s track record, the general contractor’s license and capacity, the budget’s realism, the permit status and the time to complete more intensively than on any other loan type.
  • The exit is a separate underwriting. A spec or for-sale project exits through sales; a build-to-rent or multifamily project exits through a refinance into permanent or DSCR debt. Lenders test that exit up front, either by comparing the as-completed value to sale comps or by sizing a stabilized debt service coverage ratio (DSCR, net operating income divided by debt service) on the finished rental.
  • Also called new construction loans, construction loans, vertical construction loans, spec construction loans and, when the same facility also funds lot acquisition and site work, acquisition, development and construction (AD&C) loans.

Who This Loan Is For

  • Spec home builders and infill developers putting up 1–4 unit homes, townhomes, duplexes or small condo projects for sale.
  • Build-to-rent investors constructing homes or small communities they intend to hold and refinance into long-term rental debt.
  • Experienced investors replacing a teardown with a new structure, or adding a major addition that more than doubles the living area (several programs treat that as new construction rather than rehab).
  • Developers of 5–50 unit apartment buildings and small commercial buildings who need private or bank construction debt before an agency, HUD or permanent takeout.
  • Production homebuilders and subdivision developers who need a revolving or blanket facility across many lots.
  • When a different loan fits better: a lot that still needs grading, utilities and roads belongs under Horizontal Construction / Site Development; a stalled or partly built project needs Mid-Construction Completion Financing; an existing structure that is weather-tight is a Fix & Flip Loan; larger office, retail, industrial and hospitality projects route to Commercial Construction Loans; and unentitled acreage is a Land Loan.

Eligible Collateral and Property Requirements

  • Property types: single-family residences, 2–4 unit buildings, townhomes, planned-unit developments, small condo developments (commonly capped at 9–24 units under residential programs), build-to-rent communities, 5–50 unit multifamily, mixed-use and, on commercial programs, retail, office, industrial, hospitality and special-use buildings case by case.
  • Occupancy: non-owner-occupied, business-purpose only on nearly every program. Owner-occupied construction is a consumer loan and is excluded.
  • Lot status: lender-financed land must generally be entitled, with approved plans and either issued permits or permits ready to issue (RTI). Many programs release the initial advance at a lower percentage before permits and raise it once permits are in hand. Infill lots with infrastructure already in place are preferred.
  • Land equity: if the borrower already owns the lot, most programs count its current appraised value (not the original purchase price) as project equity, usually after 6–12 months of seasoning, and advance 50–75% of that value at closing.
  • Contractor: a licensed general contractor is required on most programs; borrowers without experience can often qualify by partnering with a licensed GC who has completed comparable projects.
  • Location: urban and suburban markets nationwide; many programs require a metro population of 50,000–250,000+ and exclude rural sites. A handful of states are routinely unavailable (the Dakotas, Vermont, Nevada and Alaska appear most often on exclusion lists), and some programs reduce leverage in specific states or in New York City.
  • Lien position: first lien only. Land is often cross-collateralized or held in a single-purpose entity.

Funding Limits and Leverage

Construction leverage is quoted three ways at once, and the loan is sized to whichever cap binds first.

At a glance · Funding Limits and Leverage
Measure Low End Typical Range High End / Exception
Loan amount $50,000–$100,000 $250,000–$20 million $50–300 million (institutional and HUD programs)
Loan-to-cost (LTC, land plus construction) 65–75% (no experience, commercial) 80–90% 92.5–100% with land equity or cross-collateral
Construction budget funded 80–90% 95–100% 100%
Initial advance on land / as-is loan-to-value (LTV, loan as a share of current value) 50–60% 65–75% 80–90% (top experience tiers, HUD)
Loan-to-ARV / as-completed value 60–65% 70–75% 80%
Stabilized DSCR floor (rental exits) 1.00x 1.10–1.20x 1.25x+
  • Experience is the biggest lever. Tiered programs commonly give 90% LTC / 75% ARV to builders with 6–10+ completed projects, 80–85% LTC / 70% ARV with 2–5 projects, and 70–80% LTC / 65% ARV with none (if a licensed GC is attached). Some programs do not offer construction at all below three completed builds.
  • FICO sets the ceiling within a tier. A 700–720 score typically unlocks the top leverage; 660–680 steps down 2.5–5 points; 620–650 is the floor on most private programs.
  • Loan size moves the cap. Several programs allow 85–90% LTC only under about $2–3 million and cap larger loans at 75% LTC. Luxury spec homes and large projects price and lever more conservatively.
  • Transaction type and market. Cash-out refinances, foreign-national borrowers and some states carry 5–15 point haircuts. On multifamily and commercial product, a stabilized DSCR or 7%+ debt-yield test (debt yield is net operating income divided by the loan amount) can cut proceeds below the LTC cap.

Pricing and Terms

At a glance · Pricing and Terms
Term Typical Range Notes
Interest rate 9–12% fixed on private residential programs; 8–10% on bank and credit-union construction lines; SOFR + 5.00–6.50% floating on institutional loans Priced roughly 0.5–1.0% above the same lender’s fix-and-flip or bridge rate; Prime-based floating (Prime + 3–4%) on some regional programs; rate caps required on SOFR loans
Origination points 0–3% (most private programs 1–2.5%) 0–1% on bank and zero-point programs; 2–3% on private multifamily construction; exception tier of 3–5% on small, difficult or no-experience files
Other fees Processing/admin $1,000–$3,000; draw inspection $150–$250 per draw; appraisal or feasibility review; extension fee about 0.5 point per 3–6 months; exit fee 0.25–1% on institutional loans Funds-control fees of about 1% (minimum $1,500) on some private commercial programs
Loan term 6–36 months on private and bank programs (12–24 months most common); up to 5 years on institutional construction-to-bridge; 40 years plus the construction period on HUD-insured loans 6–9 months on small infill; 24–36 months on multifamily and subdivisions
Amortization / payments Interest-only Interest on drawn balance only (non-Dutch) on most programs; Dutch interest on the full commitment at some; first 3–5 payments can be deferred or financed on some builder programs
Prepayment None A 3-month minimum-interest clause appears on some programs; open prepayment is standard
Recourse Full recourse with personal guaranty Non-recourse with completion guaranty and standard carve-outs (exceptions that restore personal liability for fraud, misapplication of funds or environmental problems) on institutional loans; HUD construction loans are non-recourse
Reserves / holdbacks Construction holdback equal to the budget, released by draw; interest reserve of 6–18 months often financed inside the loan; contingency of 5–10% of hard costs Draws typically fund 24–72 hours after inspection; some programs release by phase from an escrow

Actual pricing and terms vary by program, property, borrower strength and market conditions. The ranges above describe where most programs fall; exception-based programs can go beyond these limits in either direction.

Qualification Requirements

  • Credit: Minimum FICO of 620–680 on most private programs, with 660 the most common floor and 700–720 required for top-tier leverage. A few asset-based programs have no minimum score. No bankruptcy or foreclosure in the last 2–7 years and no mortgage lates in the last 24–48 months are typical.
  • Experience: Counted as completed ground-up projects with the borrower on title (some programs accept two builds plus a $200,000+ renovation, or a partner builder with two recent completions). Zero-experience borrowers qualify at reduced leverage with a licensed GC on most, but not all, programs. Production-builder and institutional programs expect 4–5 similar projects in the last 24 months or 20+ units per year.
  • Liquidity and reserves: Cash to close plus 10–25% of the construction budget, or 6 months of interest plus a contingency, is a common test. Institutional programs look for liquidity of roughly 5–10% of total contingent liabilities.
  • Net worth: Rarely tested on small-balance residential loans; net worth equal to the loan amount is standard on multifamily, build-to-rent and institutional programs.
  • Entity and guaranty: Loans close to an LLC, corporation or other business entity (a single-purpose entity on larger loans). Personal guaranties from all members with 20%+ ownership are standard; a completion guaranty replaces the payment guaranty on non-recourse loans.
  • Citizenship / ITIN / foreign national: Foreign nationals are accepted on a minority of programs at 5–10 points lower leverage; ITIN borrowers are handled program by program.
  • Income documentation: No tax returns or income verification on most private programs; the project, the budget and the experience carry the file. Bank and commercial construction programs ask for 2 years of personal and business returns and a global cash-flow test.

What Underwriting Analyzes and the Documents You Will Need

What the lender analyzes:

  • As-is land value and whether the purchase price or current appraised value governs the initial advance.
  • Budget feasibility: hard costs per square foot against local norms, soft costs, contingency, and whether the construction schedule fits the loan term.
  • As-completed value from an appraisal or broker price opinion with new-construction comps, and the resulting loan-to-ARV.
  • Exit: absorption and pricing for for-sale product, or a stabilized DSCR and debt yield for rental product, plus the borrower’s ability to refinance.
  • Sponsor track record, GC license and capacity, and the liquidity to cover cost overruns and carry.
  • Entitlement and permit status, plan approvals, utility availability and any subdivision or condo map requirements.

Documents you will need:

  • Loan application with an experience schedule (address, dates, cost, sale price and unit count of recent projects) and a schedule of real estate owned.
  • Purchase contract or deed and title report for the lot; survey and site plan.
  • Approved architectural plans, permits (or proof of permit-ready status) and a line-item construction budget with a draw schedule.
  • Executed general contractor agreement and the GC’s license and insurance; builder’s risk policy at closing.
  • Personal financial statement, 2–3 months of bank statements, entity formation documents and operating agreement.
  • Exit support: sale comps or a pro forma rent roll and operating budget for rental product; pre-sale contracts if any.
  • Credit authorization, background check, and tax returns where the program requires them.

Process and Timeline to Fund

  1. Submit the project summary, budget, plans and experience schedule; most programs issue a term sheet within 1–3 business days.
  2. Order the appraisal or valuation (as-is and as-completed), the budget and feasibility review, and title; the lender verifies permits, the GC and the entity.
  3. Close with the initial advance against the land; the construction budget is held back and the interest reserve, if any, is funded.
  4. Build and draw: submit a draw request with invoices and lien waivers, a third-party or virtual inspection confirms the work in place, and funds are released, typically within 1–3 business days.
  5. Complete, obtain the certificate of occupancy, and exit by sale or by refinancing into permanent or DSCR Rental debt; some programs convert to a bridge or permanent loan without a second closing.

Closings range from about 7 business days to 30 days on private residential programs, 30–60 days on bank and institutional loans, and 5–10 months on HUD-insured construction; timing is driven mostly by permit status, the appraisal and plan review.

Challenges of Funding and Common Deal-Killers

  • Permits not issued and plans not approved: most programs will not release construction funds, and many will not close, until the project is permit-ready.
  • Thin or missing track record: fewer than 2–3 completed builds with the borrower on title fails the experience test outright at many lenders and cuts leverage sharply at the rest.
  • Budget that does not fit the term: a 24-month build with a 12-month sales period cannot be financed on an 18-month loan without an extension plan.
  • Unlicensed or over-committed general contractor, or an owner-builder without a license.
  • Rural location, small-market population or a product type (for example mixed-use commercial in a tertiary market) that no program targets.
  • Insufficient liquidity to cover the equity, carry and a realistic contingency; lenders expect the borrower to fund overruns.
  • Land under a wraparound or seller carry-back that cannot be subordinated to the construction lender’s first lien.
  • Owner-occupied intent, which moves the loan into consumer-lending rules most construction lenders do not operate under.
  • Credit events in the look-back window (recent bankruptcy, foreclosure or mortgage lates) and FICO below the program floor.
  • Unrealistic as-completed value: when new-construction comps do not support the pro forma, the ARV cap, not the LTC, sizes the loan and leaves a funding gap.

Program Variations and Sub-Niches

  • Small-balance residential spec programs ($75,000–$5 million): 1–4 units, townhomes and small condo projects; 80–90% LTC, 70–75% ARV, 9–12% interest-only, 12–24 months, no prepayment penalty, 7–14 day closings, no tax returns.
  • Experience-tiered matrices: the same program offers 90% LTC / 75% ARV at 6–10+ completed builds and 700+ FICO, stepping to 80–85% LTC / 70% ARV at 2–5 builds and 75% LTC / 65% ARV (or no eligibility) with none.
  • No-experience and first-build programs: 70–75% LTC and 65% ARV, a licensed GC with comparable completions required, higher rate and points.
  • Land-owned equity programs: advance 50–75% of the appraised land value at closing and fund 100% of the construction budget, with the land equity counting toward the borrower’s contribution.
  • Luxury spec and large single-asset builds: per-property caps raised to $15–20 million or more, leverage reduced to 65–75% LTC, deeper liquidity and pre-sale or marketing requirements.
  • Build-to-rent, subdivision and production-builder facilities: AD&C loans combining lot acquisition, horizontal development and vertical construction; $5–50 million, up to 80–90% LTC including interest reserve, up to 36 months, sponsor track record of 20+ units per year and net worth at least equal to the loan amount.
  • Private multifamily and small commercial construction ($500,000–$20 million): 5–50 unit apartments, mixed-use and small commercial; 70–85% LTC, 65–75% as-completed LTV, 9–12%, 2–3 points, 12–36 months, a 1.10–1.25x stabilized DSCR test and tax-return documentation.
  • Institutional construction-to-bridge ($20 million+): multifamily, build-to-rent and industrial; 70–75% LTC, 70% stabilized LTV, SOFR plus 5.00–6.50%, 1% in and 0.25–1% out, non-recourse with completion guaranty, up to 5 years, automatic conversion to a bridge loan at certificate of occupancy with a rate step-down.
  • Construction-to-permanent and construction-to-DSCR programs: a single approval that funds the build and then rolls into a 30-year rental loan at completion, avoiding a second origination.
  • HUD-insured new construction: 221(d)(4) multifamily and 232 healthcare; up to 85–90% of replacement cost, 40-year fixed-rate fully amortizing after construction, non-recourse, 5–10 months to close (see HUD / FHA Loans).
  • Builder non-QM construction programs: licensed builders only, broker price opinion valuation, 12–18 month interest-only, milestone draws with third-party inspection, first payment deferred up to 5 months.
  • Mid-construction and completion variants: several ground-up programs accept projects already under way, usually at reduced leverage and with a full reconciliation of costs spent to date.

Send us the basics and let’s talk

Call 714-999-7135 (answered 24/7) or apply in a few minutes.

Apply Now