Commercial Construction Loans
Apply NowWe have many programs and not all terms are available in all programs. Contact us to find out the best options for your situation.
A commercial construction loan funds the ground-up building of income-producing or owner-user commercial property (apartments of 5+ units, mixed-use, retail, office, industrial, hospitality, self-storage and similar) from permits through certificate of occupancy, with proceeds advanced in draws as work is completed. Developers and owner-users use a commercial construction loan, or a construction-to-perm loan that converts to long-term financing at completion, when a project is too large or too commercial for residential builder programs.
Overview: What Makes This Loan Unique
- The collateral does not exist yet. The lender funds against a budget, plans and a projected value rather than a finished building. Leverage is therefore measured against cost (loan-to-cost, or LTC, the loan divided by land plus hard and soft costs) and against the appraised value at completion and at stabilization (loan-to-value, or LTV, is the loan divided by that value), and the loan is sized to the lowest of those tests.
- Money goes out in draws, not at closing. Equity goes in first. The lender then advances funds monthly against inspected progress, with retainage held back until completion. Interest accrues only on the drawn balance and is usually paid from a funded interest reserve, so the project carries no out-of-pocket debt service during construction.
- Three risks are priced in. Completion risk (will it be built on budget and on time), lease-up risk (will it reach stabilized occupancy) and takeout risk (can it be refinanced or sold at maturity). Lenders manage them with completion guaranties, contingency requirements, pre-leasing or pre-sale conditions, and a takeout plan tested at today’s permanent-loan sizing.
- Sponsor experience matters more than on any other loan. Programmatic lenders want 4–5 comparable completed projects, net worth equal to the loan amount and liquidity of about 10% of the budget or 7% of contingent liabilities. A newly formed entity with no completed projects is the most common decline.
- Two markets with very different terms. Private and small-balance programs lend $500,000–$15 million at 9–12% interest-only with 650–680 credit floors and 75–90% LTC for 12–24 months. Banks, life companies, debt funds and HUD lend $2 million to hundreds of millions at 7–9% or SOFR (the benchmark floating rate) plus a spread, 65–80% LTC, with full recourse (banks) or non-recourse with carve-outs (exceptions such as fraud or bankruptcy for which the guarantor becomes personally liable) (funds, HUD) and 2–4 year terms, or 40 years on a HUD construction-to-perm loan.
Who This Loan Is For
- Developers building apartments, mixed-use, build-to-rent communities, self-storage, industrial, retail or hotels on entitled land.
- Owner-users constructing a facility for their own business, often paired with an SBA or USDA takeout.
- Sponsors repurposing an existing building (office-to-residential, hotel-to-apartment) where the scope is effectively new construction.
- Builders of small condominium and townhome developments of up to about 24 units under residential-style programs.
- Projects that need a stabilization period after completion and will exit through an agency, HUD or permanent loan.
- When a different loan fits better: lot grading, utilities and roads without vertical construction belong under Horizontal Construction / Site Development Loans; 1–4 unit spec homes fit Ground-Up Construction Loans; a stalled or partially built project needs Mid-Construction / Completion Financing; renovation of an existing commercial building is a Bridge Loan or Conversions / Adaptive Reuse Loan.
Eligible Collateral and Property Requirements
- Property types: multifamily 5+ units, mixed-use, retail, office, industrial and flex, self-storage, hotels, medical office, senior housing, build-to-rent, condominiums and townhomes; special-use (churches, gas stations, cannabis) only at niche lenders.
- Entitlements: fully entitled land with approved site plan, zoning and building permits (or permits imminent) at closing; many private programs will close before permits are pulled but will not fund vertical draws until they are.
- Land: owned free and clear or purchased at closing; land is credited at cost or appraised value depending on how long it has been held, with imputed equity for land owned more than a year at some programs.
- Market: primary and secondary metros strongly preferred; common floors are 100,000 people within 5 miles or a metro over 250,000; rural land is largely excluded outside USDA and HUD paths.
- Pre-leasing and pre-sales: commercial and retail space often requires 25–50% pre-leasing; condo projects may require pre-sales; multifamily and self-storage are usually built speculative.
- Contractor: licensed general contractor with a fixed-price or guaranteed-maximum-price contract, bonding or a letter of credit on larger projects, and a third-party cost review.
- Lien position: first lien on land and improvements with assignment of plans, permits and contracts; mezzanine or preferred equity behind the senior loan at some programs.
- Geography: nationwide programs with state exclusion lists; many private construction lenders operate in a defined set of states or metros.
Funding Limits and Leverage
Construction leverage is set against cost first, then checked against completed and stabilized value. DSCR (debt service coverage ratio) is stabilized net operating income divided by the permanent loan’s annual debt service, and ARV (after-repair value) is the projected value once work is finished.
| Measure | Low End | Typical Range | High End / Exception |
|---|---|---|---|
| Loan amount | $300,000–$500,000 | $500,000–$25 million | $50–500 million+ (institutional, HUD and loan-on-loan structures) |
| Loan-to-cost (LTC) | 60–65% (hotels, office, first-time sponsors) | 65–80% | 85–90% (small-balance under $2 million, life company participating programs, HUD 221(d)(4)) |
| Loan-to-value (LTV), as-completed | 60% | 65–75% | 80% |
| LTV, as-stabilized | 55–60% | 65–70% | 75% |
| Loan-to-ARV (small-balance residential-style) | 60% | 65–70% | 75% |
| DSCR at stabilization | 1.15x | 1.20–1.25x | 1.35x+ on hospitality and special use |
- Loan size: leverage steps down above $2–3 million at private programs (85% to 75% LTC is a common break).
- Sponsor track record: programmatic repeat builders earn the top of the range; first-time developers are cut 10–15 points or declined.
- Property type: multifamily and industrial lead; hotels, office and special use trail by 5–15 points.
- Pre-leasing, pre-sales and takeout commitments lift leverage; speculative commercial space lowers it.
Pricing and Terms
| Term | Typical Range | Notes |
|---|---|---|
| Interest rate (private and small-balance) | 9–12% | Interest-only on drawn balance; CDFI (community development financial institution) and mission lenders from about 9%. |
| Interest rate (banks, life companies, debt funds, HUD) | 5.5–9% fixed, or SOFR + 2.50–6.50% floating | Interest-only on drawn balance; HUD fixed near permanent rates; life company participating structures as low as 5.5% fixed in exchange for equity participation. |
| Origination points | 1–3% | 1% at the institutional level; 2–3% on small-balance; broker fees separate. |
| Other fees | Fund-control or draw-administration fee about 1% of controlled funds or a per-draw charge; inspection fees per draw; appraisal, cost review, environmental, legal and title at cost; extension fee 0.25–1% per 6 months; exit fee 0–1% | HUD adds application, inspection and mortgage insurance premiums. |
| Loan term | 12–24 months (small-balance); 24–48 months (institutional) | Extensions of 6–12 months for a fee; HUD construction-to-perm up to 40 years. |
| Amortization / payments | Interest-only during construction | Construction-to-perm converts to 25–30 year amortization at completion or stabilization. |
| Prepayment | None on most construction loans | Minimum-interest periods of 6–12 months on some debt-fund loans; HUD loans carry a declining schedule after conversion. |
| Recourse | Full recourse with completion guaranty (banks and private); non-recourse with carve-outs plus completion guaranty (debt funds, HUD) | Burn-down of recourse at stabilization on some programs. |
| Reserves / holdbacks | Interest reserve sized to the full construction and lease-up period; hard-cost contingency 5–10%; retainage 5–10% per draw; leasing and operating deficit reserves on institutional loans | Draws funded 3–10 business days after inspection. |
Actual pricing and terms vary by program, property, borrower strength and market conditions. The ranges above describe where most programs fall; exception-based programs can go beyond these limits in either direction.
Qualification Requirements
- Credit: 650–680 minimum on private programs; 700+ for best leverage and for institutional programs; no bankruptcy or default in the past 5 years.
- Experience: 4–5 completed projects of similar size and scope in the past 24–36 months at programmatic lenders; some small-balance programs accept first-time builders on 1–10 unit projects with an experienced general contractor.
- Liquidity and reserves: 10% of the budget or 12 months of debt service in liquid assets; 7% of gross contingent liabilities in cash at some lenders; sponsor equity of 10–35% of cost invested before the first draw.
- Net worth: Equal to or greater than the loan amount, combined across guarantors.
- Entity and guaranty: Single-purpose entity borrower; completion, carry and carve-out guaranties from principals; payment guaranties on bank loans.
- Citizenship / ITIN / foreign national: Foreign sponsors accepted at some private programs with a U.S. entity and larger equity; rare at banks.
- Income documentation: Project-based for private programs (no tax returns at many); banks require full sponsor financials and global cash flow.
What Underwriting Analyzes and the Documents You Will Need
What is analyzed:
- Total project cost with a line-item budget review by a third-party cost consultant, including land basis, hard costs, soft costs, financing costs and contingency.
- As-completed and as-stabilized appraisals, with market rent, absorption and exit cap rate (the capitalization rate, or NOI-to-value yield, a buyer is assumed to require at sale) assumptions.
- Takeout feasibility: stabilized net operating income (NOI, rent and other income after operating expenses) against permanent-loan sizing (DSCR of 1.20–1.25x and 65–75% LTV) or sale value.
- Sponsor track record, net worth, liquidity and contingent liabilities across all projects.
- General contractor capacity, contract type, schedule and bonding.
- Entitlements, permits, environmental, soils and survey; pre-leasing or pre-sales where required.
Document checklist:
- Executive summary with sources and uses, development pro forma and exit plan.
- Detailed construction budget, schedule, plans and specifications, and the general contractor’s contract and qualifications.
- Evidence of entitlements, permits (or permit status), zoning verification and utility availability.
- Land purchase contract or deed and basis documentation; survey and title commitment.
- Sponsor track record schedule, resumes, personal financial statements, schedules of real estate owned and contingent liabilities.
- Entity formation documents; organizational chart; evidence of equity funds.
- Pre-lease letters of intent or executed leases; pre-sale contracts for condominiums.
- Appraisal, environmental, cost review and feasibility reports ordered by the lender.
Process and Timeline to Fund
- Submit the project summary, budget and sponsor package; term sheets typically follow within 1–2 weeks.
- Sign the application and post the deposit; the lender orders the appraisal, cost review, environmental and legal documents and underwrites the sponsor and contractor.
- Credit approval; closing on the land and the construction loan, with sponsor equity funded and the interest reserve established.
- Monthly draw requests with inspections, lien releases and title date-downs; retainage held until completion; change orders approved by the lender.
- Completion, certificate of occupancy and lease-up; conversion to permanent financing or payoff through a refinance or sale before maturity.
Closings range from about 2–3 weeks on small-balance private programs to 60–120 days on bank, life company and debt-fund construction loans, and 6–12 months on HUD construction-to-perm; timing is driven by third-party reports, entitlements and legal documentation.
Challenges of Funding and Common Deal-Killers
- Sponsor without a track record. New entities and first-time developers fail the programmatic test at most commercial construction lenders.
- Budget gaps. Missing contingency, unsupported soft costs, no financing costs in the budget or a contractor without a fixed-price contract.
- Entitlement risk. Land that is not fully entitled or permits that depend on discretionary approvals.
- Market too small. Rural sites and metros below 100,000–250,000 people fall outside most programs; USDA or HUD paths may be the only options.
- Takeout does not size. Stabilized income that cannot support a permanent loan large enough to repay the construction loan.
- Mixed-use and special-use scope. Many lenders decline ground-up mixed-use, hospitality, condominiums or special-use buildings regardless of sponsor.
- Horizontal-heavy projects. Lot development, manufactured housing communities and subdivisions are refused by vertical-only lenders.
- Thin liquidity. Guarantors without 10% of budget or 12 months of interest in cash after the equity goes in.
- Loan size mismatch. Minimums of $3–5 million at institutional programs and maximums near $10–15 million at private ones leave a gap that mid-size projects fall into.
- Cost overruns and stalled work during construction, which trigger capital calls, lender takeovers or the need for completion financing.
Program Variations and Sub-Niches
- Small-balance commercial ground-up ($500,000–$15 million): 5+ unit multifamily, mixed-use and small commercial; 80–85% LTC under $2 million, 75% above $3 million; 9–12% interest-only; 1–3 points; 12–24 months; 650–680 FICO; no tax returns; in-house fund control; close in 2–3 weeks.
- Residential-style programs for condos, townhomes and developments up to about 24 units: up to 90% LTC, from about 10% interest, no prepayment penalty, 12–18 months, experience required, 7–14 day close.
- Bank construction loans ($2–50 million): 65–75% LTC, Prime (the bank prime lending rate) or SOFR plus 2.50–4.00%, full recourse, 24–36 months, often with a mini-perm conversion; deposit relationship expected.
- Debt fund and institutional construction ($20–200 million+): 65–80% LTC, SOFR plus 4.00–6.50%, non-recourse with carve-outs and completion guaranty, 3–4 years with extensions, rate cap required, loan-on-loan and stretch-senior variants.
- Life company and participating construction: up to 90% LTC at coupons as low as 5.5% fixed in exchange for profit or equity participation; rolls into a long-term permanent loan.
- HUD 221(d)(4) construction-to-perm: up to 85–87% LTC for market-rate multifamily, 40-year fixed-rate fully amortizing after construction, non-recourse, 6–12 month approval, Davis-Bacon wages.
- CDFI and mission-driven construction (up to $25 million): up to 80% LTV, from about 9%, up to 36 months, interest reserve required, affordable and community-serving projects.
- Construction preferred equity and mezzanine: 14–16% behind a senior construction loan to reach 80–85% of cost for ground-up multifamily.
- Owner-user construction with SBA or USDA takeout: interim construction at 75–90% of cost converting to an SBA 504, 7(a) or USDA B&I permanent loan.